Engine Installation
Engine installation The engine is installed here. |
Installation In this photo the engine has already been installed, however not yet with any covering. |
Quiet Even on a small yacht the motor can be well insolated for sound. |
Deck Beams
Deck beams First of all, the individual cross beams are mounted onto the open hull. |
Notches Reinforced notches represent those places which will later become hatches. You can clearly see from this picture the camber of beam, the curvature of the deck to the sides. |
Side view Here, you can clearly see the first part of the deck superstructure. |
Building the deck
Building the deck On the supporting lower deck beam construction we laminate an underlay for the teak decking using ship plywood. If desired, we will build you a sandwich construction for the deck, made up of plywood, a layer of extremely lightweight plastic and then another layer of plywood. |
Teak Beam Deck
Working on the teak beam deck First of all, we paint the ship plywood, or base, with resin. |
Laminating Then we laminate the individual teak rods on top. |
Spacers Small wooden wedges makes sure that the distance between the individual teak rods is uniform. |
King plank The teak beams are positioned in a particular shape up to the middle part of the deck, which is called king plank. |
Foto: Yachtbild - Kai Greiser www.yachtbild.de |
Coach roof We also give our coach roofs a teak surface. |
Priming the teak deck
Priming the teak deck First of all, the edges of the teak rods are gone through once again. |
Cleaning Afterwards, all the pieces of dirt are removed using a sharp-edged tool and a vacuum cleaner. |
Primer Following this, we paint primer into the edges by hand. |
Every single teak rod This is a very time-consuming job. |
Finished This is what a fully-treated deck looks like. |
Sealing the seams
Sealing the seams in the teak decking Teak wood only has a shrink value of approx. 1 %, but as a result of the extreme effects of the water and sun, one cannot place the rods perfectly seemless next to one another. |
All around This is also a considerable job, as often more than one thousand feet of sealant needs to be laid. |
Spatula In order to make sure the seams have been sealed one hundred percent, the sealing material is applied smoothly using a spatula. |
Sealed Afterwards the deck looks like this. |
Sanding away Finally, the superfluous sealant is carefully sanded away. |
'요트,보트' 카테고리의 다른 글
[스크랩] 요트 한척이 만들어지기까지 11 (0) | 2011.11.04 |
---|---|
[스크랩] 요트 한척이 만들어지기까지 10 (0) | 2011.11.04 |
[스크랩] 요트 한척이 만들어지기까지 9 (0) | 2011.11.04 |
[스크랩] 요트 한척이 만들어지기까지 8 (0) | 2011.11.04 |
[스크랩] 요트 한척이 만들어지기까지 7 (0) | 2011.11.04 |